One plan per inspection type, per part — first article, in-process, final, receiving
Frequency, sample quantity, and method spelled out for the floor
Attach specific gauges so the right instrument gets used every time
First / middle / last positional cadence for in-run sampling
Four enforcement modes — Off, Pre-fill, Warn, Block — set org-wide, with per-plan overrides so a safety-critical part can run Block while commodity parts run Warn
In Block mode the save is refused when the sample count is set below the plan, an off-plan gauge is used, or the required first/middle/last position isn’t tagged — nobody quietly measures 2 when the plan says 5
Enforcement is included on every tier — no enterprise upsell to make your control plan mean something